New administrative space for Central Manchester.
Two existing ward templates were converted into a flexible, high specification and open plan office space. The brief was to relocate several administrative departments, consolidate them in a single space with the intention of improving efficiency and providing a collaborative working environment.
| Sector: | Health |
| Role: | Architect, Lead Consultant, Interior Design |
| Client: | Central Manchester University Hospital NHS FT |
| Cost: | £1.6m |
| Status: | Completed – September 2018 |