Skip to content
Day Architectural LtdDay Architectural Ltd

Grosvenor Art Studio, MMU

arrow

Focus on innovation and flexibility to house a range of activity.

Working with the faculty, designs for flexible workspace pods were developed to offer as much flexibility as possible in this basement refurbishment of the Grade II listed Grosvenor Building. These bespoke joinery items help to optimise the efficient use of the space, delivering a genuinely flexible space.

Sector: Learn
Role: Architect, Lead Consultant, Interior Design
Client: Manchester Metropolitan University
Cost: £1.2m
Status: Completed – October 2018
Manchester

Studio 1
77 Deansgate
Manchester M3 2BW
0161 834 9703
info@day-architectural.com

Information

Privacy Policy
Cookies Policy

  • Home
  • Studio
    • Journal
    • News
    • Sketchbook
    • Carbon Reduction Plan
  • Projects
  • People
  • Careers
  • Contact

Login

Lost your password?